6.4 backup variantsAs prescribed in the standard procedure by OVAM for formattingsoil remediation projects, serves for a phased BSP not backup variant fitted withbe.If the monitoring that the scum also has spread, a nextphased BSP to be prepared.6.5 results after implementation of the soil remediation workThe first phase of the reorganisation work involves managing the further spread. Withother words, the driving layers should be followed. The result is not to seekdistribution of the driving layers outside the plot boundaries.In accordance with the standard procedure must clear boundaries are delineated to wherespread of the pollution is acceptable.6.5.1 Pollution 1The scum, the BBO has been identified in the monitoring wells 106, 3003, 403, 105, 111,110, 107 and 4002.Report: First phased BSP, BP Antwerp, Benzineweg 11, 2020Antwerp46326785-R150713-V01-BSP_BP ANTWERPEN_DRAFT. DOCXProject No./date: 46,326,785,685/13/07/201553If additional monitoring wells outside the horizontal contour as laid down in the BBOscum would be found, the monitoring will be intensified to locallyhalf-yearly.Spread of the floating layer is acceptable within the plot boundaries of the Site. If inone of the alarmpeil tubes 3004, PBA, 2001, 2002, 4004bis, 3100, 103, 100, 108, 408, 419pure product would be found, will initially 2 month later againfield observations made in the alarmpeil tubes. On confirmation of the presenceof the pure product will be started up an active remediation to prevent the scumthe plot boundaries. If the additional measurement no scum is established,the monitoring will be continued every six months.6.5.2 Pollution 3The scum, the BBO has been identified in the measuring tube 4011.If additional monitoring wells outside the horizontal contour as laid down in the BBOscum would be found, the monitoring will be intensified to locallyhalf-yearly.Spread of the floating layer is acceptable within the plot boundaries of the Site. If inone of the alarmpeil tubes and 419 H34 pure product would be found, will at firstinstance 2 month later again field observations made in the alarmpeil tubes. Atconfirmation of the presence of the pure product will be started up an active remediationto prevent the floating layer exceeds the plot boundaries. If in the additionalmeasurement no scum is determined, the half-yearly monitoring be continued.6.5.3 Pollution 4The scum, the BBO has been identified in 304 the measuring tube.If additional monitoring wells outside the horizontal contour as laid down in the BBOscum would be found, the monitoring will be intensified to locallyhalf-yearly.Spread of the floating layer is acceptable within the plot boundaries of the Site. If inone of the alarmpeil tubes 213, 4022, 4023 and H25 pure product would be found,will initially be done 2 month later again field observations in thealarmpeil tubes. On confirmation of the presence of the pure product will be an activedecontamination be started to prevent the floating layer exceeds the plot boundaries.If the additional measurement no scum is determined, the bi-annual monitoringbe continued.6.5.4 Pollution 6The scum, the BBO 4033 fixed in the measuring tube.If additional monitoring wells outside the horizontal contour as laid down in the BBOscum would be found, the monitoring will be intensified to locallyhalf-yearly.Report: First phased BSP, BP Antwerp, Benzineweg 11, 2020Antwerp46326785-R150713-V01-BSP_BP ANTWERPEN_DRAFT. DOCXProject No./date: 46,326,785,685/13/07/201554Spread of the floating layer is acceptable within the plot boundaries of the Site. If inone of the 309, 312, 313, 314 tubes alarmpeil, 415, 4016 and P25 pure product would befound, will initially be done 2 month later again field observationsin the alarmpeil tubes. On confirmation of the presence of the pure product will be an activedecontamination be started to prevent the floating layer exceeds the plot boundaries.If the additional measurement no scum is determined, the bi-annual monitoringbe continued.6.6 monitoring plan and description of the control measures during thesoil remediation work6.6.1 risk management monitoring plan duringTable 20: monitoring plan and control measures during first phase (risk management)Description Frequency/period location/number of Ana
Μεταφράζονται, παρακαλώ περιμένετε..
